ISCC EU · Complex RFNBO supply chains

ISCC EU RFNBO certification: what evidence defines your scope?

Prepare a complex RFNBO certification enquiry with a scope map, CO2 sourcing, liquefaction, co-processing and verified electricity evidence. See a worked review checklist.

Illustration of coordinators reviewing an industrial supply route, with the headline: Can you trace your RFNBO?
AI-generated illustration; not an actual client audit.

To prepare ISCC EU certification for a complex RFNBO supply chain, start with a map of the legal entities, sites, process boundaries, material handovers and electricity evidence. Identify who performs CO₂ sourcing, liquefaction or co-processing, then ask the certification body to assess the actual configuration. A product label such as “renewable hydrogen” does not define the complete audit scope.

The ISCC System Update of 25 November 2026 announces guidance for complex RFNBO supply chains and clarifies electricity emission-factor evidence for specified uses outside the RFNBO processing-unit boundary. This guide turns those announcements into an original enquiry checklist and worked scope review. It does not reproduce the scheme’s certification examples or establish eligibility for a particular project.

Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO handles enquiries and coordinates the certification pathway. BM Certification makes certification decisions and issues certificates where it is the appointed certification body.

What changed, who is affected and when?

ISCC announced the guidance document RFNBO Certification in Complex Supply Chains on 25 November, covering CO₂ sourcing, liquefaction and co-processing. It says the guidance will be updated as relevant European Commission regulations or RFNBO Q&A change. Use the applicable current document for the actual configuration; an earlier project assumption is not a substitute.

The accompanying electricity clarification concerns CO₂ sourcing and other electricity uses outside an RFNBO unit’s operational boundary, including hydrogen refuelling stations. An installation-specific factor for renewable electricity may be considered if independently verified under an applicable ISO standard. Source evidence is also necessary:

  • For a direct connection, retain connection diagrams and metering records.
  • For grid-delivered renewable electricity, retain a PPA and, where GoOs or EACs are issued, cancellation evidence matching the quantity and period.
  • If source or installation-specific factor evidence is insufficient, use the applicable national or bidding-zone grid factor.

The bulletin gives no separate future application date for this clarification. Confirm the applicable methodology and audit basis with the certification body. This does not replace renewable-electricity requirements within the RFNBO unit’s boundary or create blanket approval of every proposed configuration.

Build a scope map before requesting an audit quote

The project certification coordinator owns the map. Engineering identifies process and meter boundaries; commercial teams identify legal entities and contracts; operations describe what actually happens at each site; the GHG lead identifies calculation interfaces. These are suggested preparation responsibilities, not new job titles mandated by ISCC.

For each activity, record its operator, location, inputs, outputs, custody handover, relevant certificate or proposed scope, and unresolved question. Keep the intended fuel/product and market explicit. HEFA SAF, FAME and HVO are different product pathways from an RFNBO project; EU, PLUS and CORSIA are not interchangeable scheme labels.

Ask the appointed body which scopes and arrangements apply rather than assuming one participant’s certificate covers every linked company. Include contracted services and shared utilities in the description so their treatment can be assessed on facts.

Worked review: three proposed configurations, three different questions

A fictional project developer is preparing an initial-certification enquiry. Its engineering review covers three proposed configurations below. They are separate examples, not a single validated plant design or claims of technical eligibility. No real client or audit result is represented.

Proposed activityOwner’s preparation recordQuestion for the certification body
CO₂ sourcing and conditioning at a separate installationEngineering and procurement: source identity, process description, supply route, quantities, handover records and electricity boundaryHow are source eligibility, scope and GHG evidence assessed for this actual source and route?
Hydrogen liquefaction by a separate service operatorLogistics and operations: service operator/site, incoming and outgoing quantities, storage or dispatch references and utility recordsHow is this activity included in the certification and calculation arrangement, and which participant retains each record?
Proposed use of RFNBO hydrogen in a refinery alongside other inputsRefinery process and GHG leads: input streams, process boundary, output routes and proposed attribution methodWhat co-processing treatment and output-claim evidence apply? Which proposed allocation needs further review?

The coordinator marks each unresolved issue as open and assigns a response owner. It does not mark all three “covered” because the development group has selected ISCC EU. The refinery’s proposed attribution is a question to substantiate, not an approved method. This article does not prescribe a universal co-processing allocation formula.

A matching PPA quantity still does not verify the factor

In the CO₂ example, the reviewed operation is outside the RFNBO unit’s operational boundary. Its evidence pack records 36 MWh for the relevant month. The grid PPA and applicable certificate cancellation records also cover 36 MWh for that period. Procurement has resolved the source-quantity match, but the installation-specific factor report supplied refers to a different installation.

The GHG lead cannot approve that factor simply because the electricity quantities reconcile. Obtain evidence of independent verification under the applicable ISO standard for the factor and installation actually used. If the source or factor remains insufficiently demonstrated, apply the applicable country or bidding-zone grid factor under the relevant methodology and record its source, version, units and selection basis. Do not invent a zero factor or select the lowest available value.

For a direct-connected arrangement, the utility engineer instead links the claimed source to the connection diagram and meters. The reviewer checks the installation and relevant measurement records. A direct cable drawn on a diagram does not, by itself, verify the installation-specific factor.

Our worked PDCA electricity-evidence approval test explains the internal release and retest controls. The independent factor verification, electricity-source evidence and process-boundary decision remain separate checks.

What the auditor samples and reconciles

  1. Configuration: compare the current scope map with legal entities, sites, actual activities and the agreed audit plan. Sample a contracted activity rather than reviewing only the main production site.
  2. Handover: trace a selected material movement through the relevant supplier, dispatch, receipt and processing records. Compare identifiers, quantities, dates and responsibility for the evidence.
  3. Process accounting: reconcile the selected liquefaction or processing records with the applicable input/output and GHG calculation treatment. Identify losses, changes or attribution questions rather than assuming equal input and output quantities.
  4. Electricity: reconcile meter quantity and period with source evidence, then examine the independent factor verification and calculation version. In the worked example, matching 36 MWh records would not conceal the wrong-installation report.
  5. Open decisions: inspect the coordinator’s question register, supporting responses, approvals and affected documents. A completed enquiry form alone does not close an unresolved technical issue.

Retain the scope-map version, source references, review decisions, assigned actions and revised calculation or procedure records. If the arrangement changes, identify affected handovers and evidence owners before reusing an earlier assessment. These preparation checks do not predetermine the auditor’s findings or certification decision.

Discuss initial certification, recertification or a change of body

The current official ISCC directory lists BM Certification SIA for ISCC EU, ISCC PLUS, ISCC CORSIA and ISCC CORSIA PLUS. Directory recognition does not establish approval of your particular configuration or an audit date.

Use the Get-ISO ISCC certification service or certification enquiry form. Include feedstocks and other inputs, sites, legal entities, activities, intended fuel/product and market, current scheme/body, certificate expiry and target audit date. For a complex RFNBO enquiry, add the scope map, CO₂ source description, liquefaction or co-processing arrangements and electricity supply route. Initial discussion can identify the evidence needed without promising eligibility, transfer acceptance or a certification timetable.

Official sources checked on 28 November 2026

  • ISCC’s original 25 November 2026 bulletin, sections 1.1 and 1.2, checked against “New guidance for complex RFNBO supply chains” and “Electricity emission factor for RFNBO-related processes under ISCC EU” in the official System Updates register.
  • ISCC document library, the public route linked by the announcement for the new guidance and applicable system documents. The worked review here is independently prepared from the verified announcement and electricity clarification; it does not quote or reproduce the guidance document’s certification examples.
  • BM Certification’s official Australian contacts and the ISCC certification-body directory for the representation and scheme statements above.

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.