RFNBO electricity evidence: a worked PDCA approval test

Use PDCA to approve RFNBO-related electricity evidence: reconcile meter quantities, PPA and certificate cancellations, verify the factor and document a grid-factor fallback.

Illustration of utility and sustainability coordinators reviewing electricity evidence beside enclosed metering equipment in a control room.
AI-generated illustration; not an actual client audit.

Before approving an installation-specific electricity emission factor for an RFNBO-related process, check three things together: the process boundary, independent verification of the factor, and evidence of the electricity source for the relevant quantity and period. A renewable electricity contract or a supplier spreadsheet alone does not complete that evidence chain.

This exercise uses ISO-style Plan, Do, Check, Act to implement the 25 November 2026 ISCC EU electricity-evidence clarification. The scheme rule is not a new ISO requirement. The scenario and suggested approval records are original illustrative Get-ISO practice, not official exam questions, a mandatory operator examination or a qualification.

What changed, who is affected and when?

The clarification concerns CO₂ sourcing and other electricity uses outside the operational boundary of an RFNBO processing unit, such as hydrogen refuelling stations. An installation-specific factor for renewable electricity may be considered if independently verified under an applicable ISO standard.

Direct connections need connection diagrams and metering evidence. Grid-delivered renewable electricity needs a PPA and, where Guarantees of Origin or Energy Attribute Certificates are issued, cancellation evidence matching the electricity quantity and period. If the source or installation-specific factor is insufficiently demonstrated, use the applicable national or bidding-zone grid factor.

ISCC communicated this on 25 November 2026 without a separate future application date in that notice. Confirm the applicable methodology and evidence basis with the appointed certification body. This clarification does not establish renewable-electricity eligibility for every RFNBO configuration or replace the rules within the RFNBO unit’s boundary. It is an ISCC EU provision, not an automatic change to PLUS or CORSIA.

Supervisor exercise: 120 MWh consumed, 100 MWh supported

A fictional company is preparing the electricity evidence for a CO₂-sourcing operation outside its RFNBO unit’s operational boundary. For October, meter M-17 records 120 MWh and the invoice also shows 120 MWh. Procurement supplies a grid PPA covering the period, cancellation records for 100 MWh where certificates are issued, and a supplier spreadsheet labelled “installation electricity factor”. No independent verification of that factor has been demonstrated.

The utility supervisor is asked to approve the pack because the meter and invoice agree.

Your task: Is the installation-specific factor supported for the submitted 120 MWh calculation? Who resolves the two evidence gaps, what should the calculation use while evidence remains insufficient, and what records would show that the review worked?

Plan: give each part of the evidence a named owner

The GHG calculation lead owns the boundary and factor decision. The utility engineer identifies the installation, electricity use, meter and measurement period. Procurement obtains the PPA and relevant cancellation evidence. Finance provides invoice quantities and periods. A competent reviewer checks the evidence before the document controller releases the approved factor to the calculation file.

Create one applicability record linking the scheme, process, operational-boundary diagram, installation, supply route and reporting period. Record why the electricity use falls within this clarification. Do not infer that location solely from a supplier’s description or from the fact that the same company owns both operations.

Set the approval criteria before collecting files: factor identity, verification basis, source evidence, quantity and period must align. Record the applicable ISO verification standard and scope rather than guessing one from the word “ISO”. A general management-system certificate does not, by itself, demonstrate independent verification of this electricity factor.

Do: assemble a linked evidence pack and record the decision

EvidenceOwnerRetain and compare
Installation and boundaryUtility engineer and GHG leadProcess diagram, installation identity, meter reference and included electricity uses
Direct supply, where applicableUtility engineerConnection diagram and meter records supporting the claimed source
Grid renewable supplyProcurementPPA, relevant certificate cancellation references, electricity quantity and period
Installation-specific factorGHG leadFactor value and units, calculation scope and independent verification evidence under the applicable ISO standard
Approval or fallbackReviewer and document controllerDecision, unresolved gaps, selected factor source/version, approval and affected calculation references

For the exercise, the supervisor reports the mismatch instead of approving the pack. Procurement investigates the 20 MWh gap. The GHG lead obtains and checks the independent verification evidence. The supplier spreadsheet’s title is not sufficient verification.

Until the source and factor are sufficiently demonstrated, the submitted installation-specific calculation is not ready for approval. Apply the applicable country or bidding-zone grid factor under the relevant methodology and retain its source, version, units and selection basis. Do not choose whichever grid factor produces the lowest answer, invent a blended factor, or assume that a 100 MWh cancellation record supports the whole 120 MWh submission.

This example does not prescribe how a partially supported supply is allocated under every possible methodology. Any proposed split needs its own applicable basis and evidence. Keep the unresolved submission and fallback decision visible; do not mark the installation-specific factor “verified” merely because a fallback was used.

Check: reconcile quantity, period and verification scope

The reviewer normalises units before comparing the records: 120 MWh equals 120,000 kWh. Meter and invoice agreement supports the consumption quantity, but the cancellation records supplied in this example cover only 100 MWh. Check the relevant period as well as the total; an equal quantity for a different period does not demonstrate the requested match.

Then check that the independent verification actually relates to the factor and installation being used, including its scope and applicable standard. A report for another installation cannot be accepted solely because its issuer and factor label look familiar. Review the boundary and electricity source separately from the consumption arithmetic.

An auditor can select a released factor from the GHG calculation and trace it backwards through approval, verification evidence, source records, meter and period. The reverse sample starts with a meter record or cancellation reference and traces its treatment forward into the calculation. Reconcile how the relevant evidence quantity is attributed so the same support is not unknowingly used twice in the reviewed records.

In this scenario, the auditor should find the 120/100 MWh discrepancy, the unresolved verification issue, the approved fallback basis and the calculation version that used it. A tidy evidence folder without that decision trail does not demonstrate correct application.

Act: close the cause and repeat the failed approval test

If the spreadsheet lets a user release a factor with blank verification references, the calculation owner adds an approval gate and version control. If procurement routinely provides cancellation totals without periods or installation links, revise the evidence request to collect those fields. Assign each action and retain its completion evidence.

Test effectiveness with a clearly labelled training copy of the exercise. A 120 MWh submission supported by 100 MWh and no demonstrated independent factor verification should not pass the installation-specific approval route. Keep the test result, correction and retest; never introduce simulated certificates or values into real reporting.

For the next actual submission, sample the same fields and confirm that the released factor matches the approved decision. If later evidence resolves the gaps, review and authorise any recalculation with its impact and history preserved. Do not silently overwrite the calculation previously used.

Discuss your RFNBO-related evidence and audit scope

Get-ISO coordinates certification enquiries. Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. BM Certification makes certification decisions and issues certificates where appointed as the certification body.

Use the ISCC certification enquiry service or initial certification, recertification or change-of-body enquiry form. Include sites, activities, intended product/fuel and market, current scheme/body, certificate expiry and target audit date. For this question, identify the RFNBO-related process, operational boundary, electricity supply route and factor evidence available. For managing evidence versions, see our audit-criteria document-control exercise; its PLUS applicability dates do not govern this EU clarification.

Sources and status checked on 28 November 2026

  • ISCC’s original 25 November 2026 bulletin, section 1.2, checked against “Electricity emission factor for RFNBO-related processes under ISCC EU” in the official System Updates register.
  • ISCC document library, for applicable controlled documents and the complex-RFNBO guidance announced alongside this clarification. This article addresses utility evidence approval rather than every RFNBO certification configuration.
  • ASQ’s PDCA explanation, for the improvement method. The scenario, evidence register and approval test are independently developed implementation examples.

ISO’s catalogue records identify ISO 9001:2026 and ISO 14001:2026 as published, and ISO 45001:2018 as current with its 2024 amendment. Those management-system edition facts do not establish the applicable standard or scope for independent verification of an electricity emission factor.

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.