Integrated controls · ISCC EU RCF evidence
RCF supplier evidence: a PDCA test for regional treatment and dry tonnes
Use a worked PDCA exercise to check RCF supplier regional-treatment evidence, moisture records and dry-tonne calculations before releasing ISCC EU data.

Before releasing RCF supplier data, check two things separately: whether the assessment of previous use and diversion is supported by the prevailing treatment in the material’s generation region, and whether the reported quantity is actually on a dry-tonne basis. A correct spreadsheet cannot rescue an unsupported regional assumption; a well-supported assumption cannot rescue the wrong denominator.
This original exercise uses ISO-style Plan, Do, Check, Act to implement section 1.5 of ISCC’s 25 November 2026 System Update. These are ISCC EU changes, not new ISO requirements. The scenario, internal controls and calculation figures are illustrative Get-ISO practice, not official exam questions, a mandatory operator examination, a qualification or an approved GHG calculation.
What changed, who must act and when?
The clarification assigns collecting points and individually certified points of origin at the start of an RCF chain the task of determining ex-use and diversion using the prevailing treatment in the region where the material is generated. They must pass that information downstream in kgCO2eq per dry tonne of certified raw material.
The bulletin also announces an RCF sustainability-declaration template and updated proofs of sustainability, self-declarations and audit procedures in the client section. It identifies GHG reporting units for origin/collection scopes and for processing units: dry-tonne units for raw materials/intermediates, and gCO2eq/MJ for fuel outputs at processing units as applicable.
This is an ISCC EU clarification issued on 25 November 2026, with no separate future application date stated in the RCF notice. Review affected assessments and current documents now; do not import the separate PLUS January 2027 date into this exercise. The clarification does not make every waste stream eligible for RCF certification or automatically apply EU criteria to PLUS or CORSIA.
Supervisor exercise: the receipt says twenty tonnes
A fictional collecting point receives a candidate RCF feedstock lot. Its net received mass is 20.0 tonnes. A representative moisture result, linked to that lot, is 25% of wet mass. A supplier email describes a treatment route at its own site but gives no basis for treating that route as prevailing across the generation region.
The draft worksheet divides an illustrative emissions total of 3,000 kgCO2eq by 20 tonnes and displays 150 kgCO2eq per tonne. Someone proposes copying that number into a dry-tonne field and issuing the declaration.
Your task: What would you hold, who would resolve each question, which records would you retain, and what would you independently recalculate before release? Assume the numerical emissions total is a training placeholder only. It has not been established under the applicable RCF methodology.
Plan: give regional evidence and quantity evidence different owners
The certification coordinator confirms the actual scheme, certification scope, material and applicable controlled documents. The sustainability or GHG lead owns the regional-treatment assessment and calculation method. Procurement obtains missing supplier evidence. The receiving supervisor owns lot identification and links the receipt to the sampling record; a competent laboratory or designated testing function produces the moisture result. A reviewer independent of preparation approves the release.
Create a short evidence register for the proposed claim. Identify the generation location and region, material description, assessed ex-use/diversion, source references, period covered, method and unresolved questions. As a suggested evidence approach, compare relevant regional waste-treatment information with material-specific records and explain why the evidence represents that material in that region. A supplier’s actual route can contribute context; it does not by itself establish what is prevailing regionally.
Do not invent an internal percentage threshold or substitute a convenient destination region. If the evidence cannot support the proposed basis, the GHG lead keeps the assessment unresolved and obtains clarification under the applicable methodology, involving the appointed certification body where necessary.
Do: calculate dry mass without turning arithmetic into approval
For the stated training assumptions, dry mass equals wet mass multiplied by one minus the wet-basis moisture fraction:
20.0 tonnes × (1 − 0.25) = 15.0 dry tonnes.
If, solely to test the spreadsheet, the same illustrative 3,000 kgCO2eq numerator is divided by 15.0 dry tonnes, the result is 200 kgCO2eq per dry tonne. Dividing it by 20.0 wet tonnes gives 150 per wet tonne. Relabelling the latter result as dry-tonne data understates this test ratio.
Neither 150 nor 200 is a recommended emission factor. The example tests denominator control only; an actual ex-use/diversion determination needs the prescribed method and substantiated inputs. Confirm whether the moisture result is wet-basis or dry-basis before using this formula. Do not treat a moisture percentage as proof of the non-biogenic fraction or of RCF eligibility.
| Control | Retain | Release question |
|---|---|---|
| Region and treatment basis | Generation-region identification, relevant evidence, applicability reasoning and GHG-lead review | Does this support the material and region assessed? |
| Received quantity | Gross/tare/net records, instrument identification and applicable measurement checks | Can the stated net mass be reproduced? |
| Moisture and sampling | Lot/sample link, representative sampling method, result, moisture basis and test-method reference | Does the result apply to this lot and calculation basis? |
| Calculation | Controlled worksheet, source inputs, units, formula version, assumptions and independent check | Is dry mass calculated once, using compatible units? |
| Downstream record | Applicable current declaration, linked lot/quantity/characteristics and approval trail | Does the released information match the approved assessment? |
These are suggested implementation records, not a reproduction of ISCC’s private templates. Obtain current controlled forms through authorised access. Keep the original supplier statement and the unresolved evidence request rather than rewriting the statement to look verified.
Check: sample backwards, forwards and across the units
The reviewer starts with the proposed outgoing data and traces it back to the calculation, moisture result, sample identity and receipt. Recalculate the 15.0 dry tonnes independently. Check the original 20.0-tonne measurement remains distinguishable from the converted quantity; they are two bases for the same lot, not two receipts.
Then start at the regional evidence. Follow its material, geographic coverage and period into the GHG lead’s assessment and the information transmitted. A reference to a region is not enough if the cited data concerns a different material or treatment situation. Test a record where the regional evidence was missing: did the release process actually stop the unsupported information?
An auditor can select an issued declaration and reconcile its lot, characteristics, units and quantities with source records and approved calculations. Sample a different moisture result as well as the normal case, and review how the origin/collection assessment reaches the downstream processor. A raw-material dry-tonne figure must not be silently relabelled as a fuel result in gCO2eq/MJ.
Act: fix the failed control and prove it works
In this exercise, the supervisor holds the proposed data release. Procurement and the GHG lead resolve the regional evidence; the worksheet owner corrects the wet/dry denominator and makes its input basis explicit. The coordinator assesses whether earlier affected releases need correction with the responsible parties. Preserve the original record, revision reason and any communications.
Retest using a changed training input: at 20% wet-basis moisture, 20.0 wet tonnes equals 16.0 dry tonnes. The same placeholder numerator would yield 187.5 kgCO2eq per dry tonne. A spreadsheet that still outputs 200 has not responded to the new input. A spreadsheet that calculates 187.5 but releases without regional approval has fixed only half the problem.
After the correction, inspect the next relevant live receipt and release. The operator should retrieve the source evidence and explain both approval gates from normal records. Retain the failed test, corrective action, successful retest and follow-up sample. Attendance at a briefing alone does not demonstrate effectiveness.
Keep quality, environmental and safety checks distinct
For quality control, test data accuracy, version control and release authority. For environmental control, test the substance of the treatment/diversion assessment and the GHG basis; accurate transcription of weak evidence is still weak evidence. For safety, the site supervisor should consult the workers who take samples and use the site’s approved arrangements for traffic separation, material hazards and safe sampling access. Do not enter moving plant or a live vehicle route merely to complete a sample record.
These are practical management-system considerations, not additional RCF rules attributed to ISO. Current published references are ISO 9001:2026, ISO 14001:2026 and ISO 45001:2018 with its 2024 amendment. This temporary update exercise uses PDCA to implement the specified ISCC clarification; it does not claim that ISO prescribes an RCF calculation or establishes a new certification deadline.
Prepare the evidence question for your certification review
For related data-control practice, see our material-master and provenance exercise. A controlled name or field is useful only when it stays linked to its underlying evidence.
Get-ISO coordinates enquiries through the ISCC certification service and certification enquiry form. Include feedstock, generation region, sites, activities, intended fuel/product and market, current scheme/body, certificate expiry and target audit date as applicable. Identify whether the unresolved issue is regional evidence, sampling, units or the calculation method. Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. BM Certification makes certification decisions and issues certificates where appointed; an exercise or gap review does not confer certification.
Sources checked on 29 November 2026
- Original ISCC bulletin dated 25 November 2026, section 1.5, checked against the RCF entry in the official public System Updates register.
- ISCC document library. The bulletin identifies the revised RCF forms and procedures as client-section documents requiring login; their private content is not reproduced here.
- ASQ’s PDCA explanation, for the improvement method. The supplier scenario and arithmetic tests are independently developed.
- ISO catalogue records linked above, checked for publication status. Direct catalogue retrieval returned an access restriction; official catalogue search records confirmed the published editions and amendment. No draft is used as an audit requirement.
General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.