ISCC PLUS · Voluntary add-on selection
ISCC PLUS certification: GHG add-on or fuel-use exclusion?
Compare the available PLUS GHG add-on v1.2 with the FuE consultation draft. Use a chemical-recycling example to prepare output evidence and certification questions.

Considering an ISCC PLUS add-on for certification or recertification? Start with the question you need to answer. The voluntary GHG Add-on 205-01 v1.2 addresses calculation and verification of emissions for its applicable supply chains. Fuel-Use Excluded concerns attribution to material applications after accounting for fuel use, and its v1.0 document is currently a consultation draft. These are different decisions; one does not automatically answer the other.
Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO handles enquiries and coordinates the certification pathway. BM Certification makes certification decisions and issues certificates where it is the appointed certification body.
What changed in the 25 November 2026 update?
ISCC announced GHG Add-on 205-01 v1.2 as available. It draws on ISCC EU 205 and 205-1 methodologies for calculating and verifying GHG emissions along biofuel and renewable-energy-derived fuel supply chains. It applies to PLUS users under System Document v3.4.2 and the standalone documents. ISCC particularly recommends this voluntary add-on for fuel products.
The separate Fuel-Use Excluded (FuE) v1.0 document is open for consultation from 10 November 2026 to 8 January 2027. It addresses attribution excluding fuel-use quantities, particularly relevant to chemical recycling. The bulletin gives no separate mandatory adoption date for the voluntary GHG add-on. The FuE feedback deadline is not a mandatory implementation date or evidence of final publication.
These PLUS notices concern operators evaluating those voluntary options. Referencing EU methodologies within the GHG add-on does not turn PLUS certification into ISCC EU or CORSIA certification. The appointed certification body must confirm the relevant product, activity, site and add-on arrangements.
Which question belongs to which document?
| Your business question | Document and current status | First preparation step |
|---|---|---|
| How should the relevant fuel supply chain calculate and verify emissions under a voluntary PLUS add-on? | GHG Add-on 205-01 v1.2: available, voluntary, with the stated PLUS document applicability. | GHG lead maps the product, boundaries, data sources and applicable calculation/verification criteria. |
| How could fuel-use quantities affect attribution to material applications in chemical recycling? | FuE v1.0: consultation draft, not a finalised document in this notice. | Technical lead maps outputs, destinations and end-use evidence in a clearly labelled draft-readiness exercise. |
| Does a FuE assessment demonstrate compliance with the SUPD Implementing Act methodology? | No. ISCC explicitly distinguishes that regulatory methodology from the voluntary FuE approach. | Coordinator identifies the actual regulatory question and obtains the relevant separate criteria. |
A site may have more than one question to review. Do not force all products or customer requests into one add-on merely because the documents appeared in the same bulletin. Nor does a GHG result alone prove a recycling-attribution quantity.
Chemical-recycling example: reconcile outputs before discussing attribution
The following quantities and workflow are original illustrative Get-ISO records, not an ISCC example, a prescribed yield, an allocation formula or an actual certification result.
A fictional pyrolysis operator reviews one production period with 100 tonnes of plastic feedstock and no opening or closing process inventory. For this simplified exercise, its reconciled records show 65 tonnes of liquid output, 20 tonnes of gas used for on-site energy, 10 tonnes of solid output and 5 tonnes of documented process losses. The mass totals 100 tonnes. The operator still needs evidence of each stream’s characteristics and use.
The commercial team asks whether all circular input can be presented as recycling-attributed material because the plant recovered useful outputs. The worked response is to keep physical recovery, fuel use, GHG results and eligible attribution distinct. A balanced mass total is only the starting check. It does not establish an eligible-credit quantity.
The technical lead marks the gas’s recorded energy use, investigates the solid output’s actual destination and links the liquid output to its downstream recipients. Procurement and sales gather relevant supplier and customer evidence. The coordinator records which questions remain open. No assumed yield or unverified customer intention is used to invent a recycling claim.
What the FuE draft adds to that review
The consultation draft proposes a sequence of attribution, fuel exclusion and then permitted reallocation. It distinguishes fuel, material and dual-use outputs. Its pyrolysis section addresses on-site energy consumption and explains that onward supply to certified processors does not settle final fuel exclusion throughout the chain. These are draft provisions to review, not current final certification findings.
For the illustrative period, the operator prepares an output register rather than a claimed credit total. Each line records the measured quantity, process reference, recipient or on-site use, evidence available and unresolved classification. That is an original readiness tool, not a reproduction of the draft’s bookkeeping template.
The 65-tonne liquid total should not be converted into an automatic “65 tonnes recycled” statement. The technical team must review the applicable process-specific rules and relevant downstream evidence. The 20 tonnes used for energy must remain identifiable in the exercise instead of disappearing into an undifferentiated recovered-output figure. The solid stream and losses also remain in the reconciliation, with their own evidence.
This walkthrough intentionally stops before calculating FuE credits. It demonstrates the evidence decisions to prepare, not a complete application of a 36-page draft. A finalised method and its application arrangements must be checked when published; the consultation closing date does not itself authorise a claim.
Who implements the controls and what is retained?
- Certification coordinator: identifies the intended scheme, product, market and add-on status; retains the applicable document references, scope review and certification-body questions.
- Production and stock controller: reconciles feedstock, inventory, outputs and losses; retains measurement sources, period boundaries, adjustments and explanations for differences.
- Technical lead: maps each output and its supported use; retains process descriptions, recipient evidence, classifications under review and unresolved questions.
- GHG lead: separately reviews whether 205-01 v1.2 applies to the relevant product and intended assessment; retains boundaries, source data, calculation version, review and verification arrangements.
- Claim reviewer: checks proposed customer wording against the actual evidence and authorised scope; retains approval or hold decisions and any correction trail.
The division above is suggested implementation practice. The actual operator needs competent people and controls suited to its activities. A polymer or pyrolysis project is not automatically within the GHG add-on’s product scope simply because it has energy data.
What can an auditor sample and reconcile?
For an adopted GHG add-on within an agreed engagement, an auditor can trace a reported result through the relevant calculation, source inputs, boundaries, method/version and supporting evidence under the applicable criteria. The coordinator should have the current controlled add-on document available; this article does not replace its detailed requirements.
For the chemical-recycling readiness example, select the 100-tonne period and reconcile the 65, 20, 10 and 5 tonne records with source measurements and period boundaries. Follow an output into its recorded destination or on-site use. Investigate differences between production, inventory and dispatch records rather than accepting a manually forced total.
Then select a proposed customer statement. Does it describe a supported GHG assessment, an existing permitted scheme claim or merely a trial under the consultation draft? Check that draft-readiness outputs have not been described as final FuE certification. Reviewing readiness against a draft is not the same as making a final certification decision under an adopted scheme document.
Our PDCA exercise for separating add-on data and claims tests the related document-release control. This article focuses on selecting the technical question and preparing the underlying output evidence.
Voluntary markets and the regulatory boundary
ISCC states that FuE is designed for voluntary markets and may support certain Extended Producer Responsibility requirements depending on the applicable framework. It does not follow the Single-Use Plastics Directive Implementing Act methodology and cannot demonstrate compliance with that methodology. Do not reduce that distinction to a generic “regulatory compliant” sentence.
The technical and commercial teams can use the consultation to identify unclear output-use cases and prepare feedback by 8 January 2027 through the official consultation page. No feedback submission is made by this article. Stakeholder comments on that page are not scheme requirements.
Discuss the appropriate certification or recertification pathway
The ISCC directory lists BM Certification SIA for ISCC EU, PLUS, CORSIA and CORSIA PLUS. Confirm the proposed site, activities, product scope and relevant technical assessment with the appointed body. A directory listing does not guarantee that a particular add-on, plant or claim is accepted.
Contact Get-ISO through the ISCC certification service or initial certification, recertification or change-of-body enquiry form. Include feedstock, sites, activities, intended fuel/product and market, current scheme/body, certificate expiry and target audit date as applicable. Add the proposed add-on, current document/version and whether your question concerns emissions, output attribution or a regulatory claim.
For a change of body at recertification, identify relevant prior audit findings and their closure evidence. Get-ISO coordinates the enquiry; BM Certification makes certification decisions and issues certificates where appointed. No audit date, acceptance or certification outcome is promised here.
Official sources checked on 29 November 2026
- Original ISCC bulletin dated 25 November 2026, sections 2.1–2.2, checked against the public System Updates register.
- ISCC document library, for the current GHG add-on and applicable system documents. This guide summarises the verified availability and applicability notice, not every calculation condition in v1.2.
- ISCC public consultation page and its FuE v1.0 draft PDF, particularly the methodology and pyrolysis sections. Draft provisions are identified as such; no third-party worked example or graphic is reproduced.
- BM Certification’s official Australian contacts and the ISCC certification-body directory for the regional appointment and listed schemes.
General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.