Discuss your requirements ↗

Home / Resources

ISCC EU · UCO declaration corrections

How to handle an incorrect ISCC EU Sustainability Declaration for UCO

Found an error on a UCO Sustainability Declaration? Check whether the claim has moved downstream, preserve the evidence and coordinate the correction process.

If a UCO Sustainability Declaration contains an error, preserve the original and check whether its sustainability information has already been used downstream. Flag affected transactions and contact your certification body before treating a replacement as valid. When arranging recertification with a different body, include unresolved corrections in the records you provide.

Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO handles enquiries and coordinates the certification pathway. The ISCC directory lists BM Certification SIA as a cooperating body for ISCC EU and ISCC CORSIA. BM Certification makes the certification decision and issues certificates where appointed.

Establish whether the specified correction procedure applies

ISCC EU 203 v4.2, section 3.3.2, provides a correction or cancellation process when the recipient has not forwarded the incorrect information and corrects the associated mass-balance entries. It requires written communication involving the supplier, recipient, their certification bodies and ISCC, including acknowledgement by the recipient’s body. The supplier then issues the corrected declaration, and the bodies retain and verify the case. A newly contracted body must be informed of the affected transactions. If information has already moved downstream, refer the full facts to the certification body and ISCC for the applicable handling.

Practical checklist for the person investigating the error

  1. Identify the document and load. Record the declaration reference, issuer, recipient, physical shipment, error and discovery date. Keep the original document and supporting transaction evidence.
  2. Trace how the information was used. Check the incoming ledger, allocations and outgoing declarations or database records. Record what has been verified and what remains uncertain. Flag affected quantities and claims so the error is considered before further use.
  3. Make one case file. Assign a case owner and gather the written notifications, acknowledgement and instructions. Link each revised document to the original reference and retain the reason for the revision.
  4. Verify the ledger outcome. The responsible reviewer checks that quantities and attributes agree across the affected records and that the superseded document cannot be reused accidentally. Retain the dated check and unresolved actions.

Worked example — the wrong country is carried onto a UCO declaration

An illustrative trader receives declaration SD-051 for 15 tonnes of UCO. The origin field conflicts with the supplier’s supporting records. The trader has received the oil but has issued no outgoing declaration against the entry. Its sustainability lead logs the discrepancy, confirms the status of the entry and asks the supplier to start the documented correction process with the relevant parties. The reviewer checks the resulting document and ledger adjustments against the case file before releasing the hold.

If the trader discovers that 6 tonnes were already allocated to an outgoing claim, the case owner adds that document and recipient to the transaction trail and escalates the wider case. Preserve what was actually issued so the affected parties can determine the required action. The quantities and document reference are illustrative.

Keep the scheme and certification enquiry clear

This article addresses ISCC EU records for UCO supply chains serving FAME biodiesel, HVO renewable diesel or HEFA sustainable aviation fuel markets requiring the applicable EU claim. For a HEFA chain supporting an ICAO CORSIA claim, check the separate ISCC CORSIA procedures with the appointed body. Confirm the buyer’s scheme and intended market before acting.

Official references and certification enquiries

Use ISCC EU 203 v4.2, section 3.3.2, the ISCC document library for current material lists and scheme documents, and ISCC system updates for applicable instructions. Review the related guide to changing ISCC certification bodies when assembling recertification records.

Contact Get-ISO through the ISCC certification coordination service to discuss initial certification, recertification or a change of body. Summarise the issue in the enquiry and arrange a secure channel for detailed commercial records.

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.

All resources · Related service

Call Mason