Discuss your requirements ↗

Home / Resources

ISCC EU · Material eligibility and regional GHG

ISCC EU certification: which material entry and regional GHG value can I use?

Check ISCC EU material-list changes and Slovak wheat or sorghum regional GHG evidence before an audit. Use a worked origin-and-quantity review checklist.

Illustration of coordinators checking grain-origin evidence; headline: Does your crop origin qualify?
AI-generated illustration; not an actual client audit.

Before an ISCC EU certification enquiry, identify the exact material entry and the evidence supporting its origin and GHG treatment. A shorter product name does not approve a new feedstock. For Slovak wheat or sorghum, a recognised regional cultivation value needs a supported crop-and-region match; a Slovak supplier address alone is insufficient.

This guide implements the material-list and Slovak regional-value clarifications in ISCC’s 25 November 2026 System Update, sections 1.3–1.4. The checklist and cases are original illustrative Get-ISO examples, not official audit forms or evidence of an actual certification result.

Mason Ali is BM Certification’s ISCC representative for Australia and New Zealand. Get-ISO handles enquiries and coordinates the certification pathway. BM Certification makes certification decisions and issues certificates where it is the appointed certification body.

What changed, who is affected and when?

ISCC EU’s list now uses shorter co-processed names, such as Co-processed Diesel; the former separate biomethane-derived diesel/petrol/jet entry is covered by the respective co-processed entries. Additional information for animal by-products and rendered animal fats has changed. Municipal-solid-waste names now distinguish the biogenic fraction from the fossil fraction.

The notice concerns EU users selecting those entries and parties evaluating their evidence. It was issued on 25 November 2026 without a separate future start date for the list changes. Check current conditions before approving an affected classification. The January 2027 PLUS audit-risk date does not apply to this EU list review.

The same bulletin confirms recognised NUTS3 cultivation values for eligible Slovak wheat and sorghum under the applicable EU and ISCC criteria. This concerns farms, first gathering points and downstream operators relying on that cultivation information. It does not establish CORSIA or PLUS eligibility, or approve every material for every fuel pathway or destination.

The November clarification is not a new November legal recognition

Commission Implementing Decision (EU) 2026/53 was adopted on 6 January and published on 8 January 2026. Article 3 provides for entry into force twenty days after publication and cessation on 28 January 2031. Its Annex gives crop-specific regional cultivation data on a dry-matter basis. Check the applicable decision and Annex when approving the calculation.

A cultivation component is not a complete fuel GHG result. The GHG lead must retain the method, units, conversion inputs and applicable allocation basis needed by the actual supply chain. Do not paste a crop value directly into a field expecting a finished-fuel result in gCO2eq/MJ. ISCC’s regional-value guidance explains recognition and supporting-data considerations. It recommends recording the regional code; this article does not turn that recommended template field into a universal mandatory field.

A scheme-specific evidence checklist before requesting an audit

The certification coordinator should assign one decision owner for each row. These are suggested preparation controls. They help the appointed certification body assess the actual scope; completing them does not grant certification.

DecisionOwner and evidence to retainWhat an auditor can sample
Which scheme, activity and market?Certification coordinator: sites, legal entities, physical activities, intended fuel/product, destination and proposed scheme.Actual activities against proposed or existing certificate scope and transaction claims.
Which material-list entry?Technical lead: applicable list version, exact selected row, additional information, supplier description and production route.Affected receipts against the selected entry and the reasoning for classification.
Which crop and growing region?Procurement and supplier: farm/field origin references, crop, regional identification and links to the received lot.Origin evidence through supplier records to deliveries; dispatch location alone is insufficient.
Which cultivation calculation?GHG lead: recognition reference, correct crop/region row, units, dry-matter inputs, conversion and allocation method, reviewer approval.Source value through calculation to the transmitted cultivation information; assumptions and units reconciled.
Which quantity carries which characteristics?Stock controller: linked receipts, movements, dispatches and remaining balances, with unresolved evidence identified.Quantity reconciliation and whether a supported characteristic has spread to unsupported stock.

Worked case: two wheat receipts, one incomplete regional record

A fictional trader preparing an ISCC EU recertification review receives two wheat lots. Lot W1 is 80 tonnes on a documented dry-matter basis, supported by farm and delivery references identifying growing locations in Trnava, SK021. Lot W2 is 20 dry tonnes bought through a Slovak intermediary; the file currently contains only the intermediary’s address and the loading site.

The commercial team asks whether all 100 tonnes can be sold with the same regional cultivation information. The worked response is no: W2’s growing region has not been established. The GHG lead can review W1 against the wheat row for SK021 in the recognised Annex, alongside the other applicable criteria and calculation method. That is a review step, not a finding that W1 is automatically compliant.

Procurement requests W2’s underlying crop-origin evidence and assigns an owner for resolution. The controller keeps its unsupported regional characteristic from being released. This hold concerns the proposed regional-value claim; it is not a conclusion that W2 has no possible compliant GHG treatment. Any alternative method needs its own substantiation under the applicable criteria.

Assume no opening stock, losses or other movements. A 50-dry-tonne dispatch attributed to W1 leaves 30 dry tonnes of W1 and 20 dry tonnes of W2. The total balances: 100 received minus 50 dispatched equals 50 remaining. Yet only W1’s quantity has the stated regional evidence. Matching the total does not justify giving W2 the same characteristic.

The auditor selects the 50-tonne dispatch and follows its characteristic back to W1, farm origins, region selection and calculation approval. A reverse sample starts with W2 and checks that it has not acquired W1’s regional value. Reconcile any wet-weight delivery records to the stated dry basis using retained measurements and the approved method; do not silently mix the two bases.

Three material-list questions to resolve with the certification body

  • Co-processing: a processor’s enquiry should identify the actual output and upstream route. A renamed entry does not erase a biomethane origin or justify combining different fuel outputs into one vague category. Retain the route evidence behind the proposed entry.
  • Animal by-products and rendered fats: procurement should obtain the specific classification and source information needed to assess the current row’s additional conditions. The bulletin flags a revision; it does not provide a blanket approval for every animal fat. Do not infer eligibility from a supplier’s familiar trading name.
  • Municipal solid waste: the technical lead should substantiate the relevant fraction and its quantity. A mixed load described as municipal waste cannot simply inherit an entirely biogenic claim. Where fraction evidence is unresolved, keep that classification question open for the appropriate scheme and scope review.

For each question, retain the original supplier records, applicable list reference, technical assessment, unresolved points and certification-body correspondence. The auditor can compare receipts, production or fraction evidence as relevant, outgoing declarations and quantity records. Our PDCA exercise for material-name changes and ERP provenance covers implementing an approved mapping without losing that history.

Use the same evidence pack when comparing bodies or changing at recertification

Send a concise scope summary first. Include the material questions requiring assessment, the intended market and the calculation approach proposed. A quotation based only on “waste trader” or “grain supplier” can omit the actual technical issue. For a change of body, identify the current scheme/body, certificate expiry, relevant prior findings and their closure evidence, plus the target audit date. Agree secure access for detailed records.

After resolving a missing-origin case, the coordinator should test the next affected dispatch: can the reviewer retrieve crop, region, source reference, calculation and quantity trail from normal working records? Keep the failed review, corrective action and successful recheck. A newly populated region field without the underlying evidence is not an effective correction.

The ISCC certification-body directory lists BM Certification SIA for ISCC EU, PLUS, CORSIA and CORSIA PLUS. The appointed body still needs to confirm the applicable activities, location and engagement scope; a directory listing is not a promise that a particular supply chain will be accepted.

Contact Get-ISO through the ISCC certification service or the initial certification, recertification or change-of-body enquiry form. Include feedstock/material, sites, activities, intended fuel and market, current scheme/body, certificate expiry and target audit date. For regional cultivation questions, add the crop, growing-region evidence and proposed GHG method. For renamed materials, identify the previous and proposed entries.

Official sources checked on 28 November 2026

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.

All resources · Related service

Call Mason