Discuss your requirements ↗

Home / Resources

Integrated ISO · Management review

How to run an integrated ISO management review that leads to a decision

Use a dispatch bottleneck to turn ISO 9001, ISO 14001 and ISO 45001 management review data into one decision, with an owner and effectiveness checks.

Bring one decision to management review with evidence from quality, environment and safety. Agree who will act, what result you expect and when leadership will check it. In this illustrative example, a warehouse uses Plan, Do, Check, Act to decide whether to release orders in smaller batches during the afternoon dispatch peak.

Plan the decision and agree how to judge it

The operations manager brings two comparable periods of dispatch data and explains differences in order volume and mix. The management team agrees the criteria before the pilot. Use separate measures so an improvement in one area cannot hide a problem in another.

  • Quality. Track wrong or incomplete orders per 100 shipments and the proportion dispatched by the promised cut-off. Ask who can hold a shipment when the final check fails.
  • Environment. Count discarded cartons and weigh discarded wrapping, reporting each per 100 shipments. Include packaging discarded during repacking and record any change in how waste is handled.
  • Safety. Ask packing and loading workers where the peak creates congestion or extra handling. Agree which controls a supervisor will observe, such as keeping designated routes clear and using handling aids as planned.

Give the pilot an owner and boundaries

Leadership authorises a trial on one dispatch lane. The shift supervisor owns daily checks, briefs the team on the batch release times and records exceptions by shift. Confirm the changed sequence with workers before it starts and agree when the supervisor should suspend the trial, including if a designated route cannot be kept clear.

Bring the trade-off back to management

Compare the pilot with the baseline using a similar mix of orders. Suppose wrong orders fell from four to two per 100 shipments and late dispatches were steady, but repacking waste increased and workers reported more double handling. Review the actual work sequence with the team. Keep the quality improvement, the extra packaging and the handling problem visible in the decision record.

Record the decision and test it again

In this example, leadership keeps the trial on one lane and asks the supervisor to revise the sequence so labels are checked before cartons are sealed. The review record assigns an owner and due date for that action. At the next comparable peak, check error rates, packaging discards and observed handling together before deciding whether to roll out the change.

What to keep for the next review

Retain the baseline and measure definitions, worker feedback, pilot observations, the decision and any resources approved. Link the follow-up results to that decision. Use this as one agenda item within your full management review.

ISO’s ISO 9001:2026 overview highlights leadership and quality culture. Its ISO 14001:2026 revision overview describes a more structured environmental management review. For worker participation, use the applicable published ISO 45001:2018 edition and amendment. The dispatch measures are illustrative. Use ASQ’s PDCA guide for the method and our integrated internal audit guide to build a traceable evidence sample for the review.

For an independent check of your transition evidence, see Get-ISO’s ISO 9001 audit and gap assessment service.

General guidance. Use the applicable standard, scheme documents and agreed engagement criteria. Examples are illustrative and do not establish a certification outcome.

All resources · Related service

Call Mason